Apr 23, 2018· Estimating concrete steps. Steps seem tricky to calculate but are not. If there are three steps leading up to a porch: Use the slab calculator to figure the concrete needed for the porch surface. Use the footing calculator to calculate the sides of the porch and the steps; Here is an example:

High strength concrete would be mixed using 1 part cement to 5 parts ballast – this affords the sort of watertight concrete used for building slabs or concrete panels. Mixing 1 part cement to 6 parts ballast creates concrete suitable for driveways, paths and patios, and increasing the ratio to 1:8 gives foundationstrength concrete.

Construction Aggregate Calculator. Enter the width, length, thickness, and product density and hit the "Calculate" button to calculate your estimate. If you do not know the product density, use the optional density estimator* or contact a local sales representative.

Free online concrete calculator for your construction projects. Calculate the required weight and volume of readymix concrete you need for your wall, column, steps, slabs, footings, and others. Easy to use calculator for how much concrete you need in cubic feet, cubic yards, cubic meters, tons, tonnes, as well as bags of concrete of different sizes.

Auburn Aggregates. To speak directly to us regarding our products, please call or email info. Hours of Operation: Monday through Friday, 6:30am – 5pm; Saturday Hours to resume on May 2, 2020, 6:30am – 12pm; Sunday, Closed

These Concrete Calculators provide the required quantities of cement and allin ballast or cement, sharp sand and gravel required to give a defined volume of finished concrete. Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general ...

57 Tonnes of Hardcore / Type 1 Required . 48 Tonnes of Sand Required . OR. 57 Bulk Bags of Sand Required

For 10 square meters of concrete block wall, you would need 110 blocks, assuming a mortar bed depth of 10mm and with a mix of 1:5 cement: sand and 10% wastage you would need cubic metres of mortar, which would require cubic metres of cement and cubic metres of sand (the cement sits in the spaces between sand grains and so does ...

Dec 21, 2016· Therefore volume of 1 bag cement = 50/1440 = cum. ∴ No. of cement bags required in 1 cubic meter = / = bags. Note: You can use the same formula for calculating cement for other nominal mixes.

General mix 1:5 cement:allin ballast or 1:2½:3½ cement:sharp sand:gravel. and ; Paving mix 1:3½ cement:allin ballast or 1:1½:2½ cement:sharp sand:gravel. Comment: If you are wondering how 1:2½:3½ equals 1:5 ("shouldn''t it be 1:6" I hear someone say), the answer is that there is a lot of space between the individual pieces of gravel ...

Quantity Calculator fluidadmin T10:51:04+00:00 If you are unsure how much aggregate you need, use our calculator below. Select your aggregate type, then enter your measurements below.

Using this quantity calculator you can find out just how much material you need. Use the top form for Metric and the lower form if you prefer feet inches. Carefully enter values for the length, width depth in all the red fields. Choose a density of for concreting ballast, for .

Our concrete calculator provides you an easy way to calculate concrete volume and estimated cost of concrete slabs, footers, walls, columns, steps, stairs, curbs and gutters in cubic feet, cubic yards, and cubic meters and inches. It makes your construction project planning and budgeting more accurate.

Concrete mix ratios are prescribed ratio of cement, sand and aggregate to get the desired strength in concrete. The volumetric mix ratio of M20 concrete is 1::3, hence 1 part of cement, part of sand and 3 part of aggregate in volume is needed to prepare M20 grade concrete.

To calculate the amount of ballast you will need find the weight of concrete required. To do this multiply the cubic meters by which will give you the weight of the concrete required in metric tonnes. With a standard 3 in 1 sub ground concrete mix, (3 parts ballast to 1 part cement), each 850kg bag of ballast will account for 1150 kg of ...

Concrete Mix Ratio Calculator. An online on site concrete calculator to calculate the concrete mix ratio. It plays a major role in creating a strong, durable concrete block. The major materials needed in the preparation of concrete blocks are portland cement, sand, aggregate (stone), and water.

Landscape Gravels tons (2,400 2,700 lb.) per cubic yard Washed Gravel tons (2,700 lb.) per cubic yard Washed Limestone tons (2,400 lb.) per cubic yard

The below image shows quantity of cement, fine aggregate, Coarse aggregate for 1m³ of concrete. I hope it''s clear..

Both concrete calculators make an allowance for the fact that ballast etc losses volume when mixed to make concrete. Two Calculator are provided for different concrete mixes: General mix 1:5 cement:allin ballast or 1:2½:3½ cement:sharp sand:gravel.

Both concrete calculators make an allowance for the fact that ballast etc losses volume when mixed to make concrete. Two Concrete Calculator are provided for different concrete mixes: General mix 1:5 cement:allin ballast or 1:2½:3½ cement:sharp sand:gravel.

Enter Round off answer to next even higher figures. This calculator is intended for approximate guidance. Working with Concrete Tips Hand Mixing Only use clean water, sand and gravel. Aim for a mix of 1 part cement, 21/4 part sand and 3 parts aggregate. Mix the dry cement and sand, add water, mix, then add aggregate, and more water as needed.

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/ = Bags ~ 6 Bags Sand required = 115/ = 688 Kgs or cft .

Concrete Price Per Square Foot. A typical 6" thick concrete slab costs 5 to 10 per square foot depending on the concrete quality and project size. Decorative options such as coloring, stamping, patterns, or special finishes bring the total installation cost to 8 to 18 per square, most concrete jobs are measured in cubic yards instead of square feet.

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, m 3 of sand and m 3 of stone aggregate.